Emerson ROSEMOUNT 5300 Spezifikationen Seite 59

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 106
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 58
Reference Manual
00809-0600-4026, Rev BA
December 2011
5-3
Rosemount Process Radar
QUICK INSTALLATION
GUIDE
Step 1. Mount The
Transmitter
Cone antenna with flange
1. Place a gasket on top of the tank
flange.
2. Lower the transmitter with antenna
and flange into the tank nozzle.
3. Tighten the bolts and nuts with
sufficient torque for the flange and
gasket choice.
Process Seal antenna with flange
(1)
1. Place the antenna on top of the
nozzle.
2. Mount the flange and tighten the bolts
cross-wise. For torque information,
see Table 5-1.
3. Mount the transmitter head and tighten
the nut to 40 Nm (30 Lbft).
4. Re-tighten the flange bolts after 24
hours.
(1) The mounting information applies to the updated Process Seal antenna design, released in
January 2012. Antennas manufactured before this date have wetted o-rings and require a
different installation procedure. For installation guidelines, refer to the Rosemount 5400
Series Quick Installation Guide (Document No. 00825-0100-4026, Rev DA and prior) and
the Rosemount 5400 Series Reference Manual (Document No. 00809-0100-4026,
Rev FA and prior).
Bolt
Gasket
Flange
Tank
flange
Cone Antenna
Transmitter
housing
Nozzle
Nut
Nut,
40 Nm
(30 Lbft)
Locking screw
(ATEX)
Bolt
Flange
Tank flange
Nut
Nozzle
Transmitter
housing
Locking screw
(ATEX)
Process Seal
antenna
Nut,
40 Nm
(30 Lbft)
Seitenansicht 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 105 106

Kommentare zu diesen Handbüchern

Keine Kommentare