3. Remove body from the line to inspect the internal
wetted parts.
4. Loosen the nut (key 16) while holding wrench
ats on plug (key 3) to inspect internal wetted parts.
Remove the lock washer (key 24) and at washer
(key 23). The lower spring seat (key 8), guide ring
(key 9), diaphragm (key 7), and plug O-ring (key 3)
can now be removed from the plug (key 2).
An optional lower diaphragm plate (key 10) and
O-ring (key 4) are included for the constructions
offering protection against vacuum conditions.
5. Remove the plug (key 2) through the inlet port of
the body (key 1). Inspect parts for damage.
Replace if damage is noted. Refer to the section
titled Soft Seat Maintenance when the seat needs
to be replaced.
6. Reassemble in the reverse order of the above
procedure. Start by inserting the plug (key 2)
through the inlet port of the body (key 1). The
order is listed below or please refer to Figure 3.
a.) Plug (key 2)
b.) Plug O-ring (key 3)
c.) Diaphragm plate (key 10) (vacuum
protection construction only)
d.) Diaphragm plate O-ring (key 4) (vacuum
protection construction only)
e.) Diaphragm gasket (key 6) (Metal
diaphragms only)
f.) Diaphragm (key 7)
g.) Diaphragm gasket (key 6) (Metal
diaphragms only)
h.) Guide ring assembly (keys 9 and 5)
i.) Lower spring seat (key 8)
j.) Flat Washer (key 23)
k.) Lock Washer (key 24)
l.) Hex Nut (key 16)
7. Hold wrench ats on plug (key 2), then torque hex
nut (key 16) to 6 to 8-inch-pounds (0,7 to 0,9 N•m)
for the NPS 1/2 and 3/4 (DN 15 and 20), 5 to 7 foot-
pounds (7 to 9 N•m) for the NPS 1 and 1-1/2 (DN 25
and 40) and 28 to 30 foot-pounds (38 to 41 N•m) for
the NPS 2 and 3. After tightening, apply Loctite 290
or equivalent to the nut/thread interface.
8. Position diaphragm assembly in body (key 1).
Replace regulator spring (keys 12 and 13, when
applicable) and upper spring seat (key 11).
Replace the spring case (key 14) and sanitary
clamp (key 15). Torque clamp nuts to 20 to 22 foot-
pounds (27 to 30 N•m) for the NPS 1/2 through
1-1/2 (DN 15 through 40) and 38 to 40 foot-pounds
(52 to 54 N•m) for the NPS 2 and 3 (DN 50 and 80).
9. Install in pipeline and follow Startup and
Adjustment procedures.
Take care not to damage the internal/wetted surface
nish when performing Soft Seat Maintenance.
1. Disassemble the regulator as stated above.
2. To access soft seat (key 28), unscrew the lower
plug (key 27) from the upper plug (key 26). If
damaged, replace with new part. Apply Loctite 246
or equivalent to the male threads before assembly.
Proper torque for the assembly is 6 to 8-inch-pounds
(0,7 to 0,9 N•m) for the NPS 1/2 and 3/4 (DN 15 and
20); 8 to 10-inch-pounds (0,9 to 1,1 N•m) for the
NPS 1 and NPS 1-1/2 x 1 (DN 25 and 40 x 25); and
5 to 7 foot-pounds (7 to 9 N•m) for the NPS 1-1/2
(DN 40). Torque for NPS 2 and 3 (DN 50 and 80) is
23 to 25 foot-pounds (31 to 34 N•m).
3. Reassemble as stated in the prior section.
When corresponding with your local Sales Office
about this equipment, always reference the
equipment serial number and FS number that can
be found on the nameplate.