Emerson DCF Optimized Racks Bedienungsanleitung Seite 1

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Gestelle Emerson DCF Optimized Racks herunter. Emerson DCF Optimized Racks User's Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - Optimized Rack System

Integrated Cabinet SolutionsFor Business-Critical Continuity™DCF™ Optimized Rack SystemUser Manual

Seite 2 - SAVE THESE INSTRUCTIONS

Installation63.3 Unloading the DCF Optimized Rack SystemBefore unloading a DCF Optimized Rack System, note the weight of the model (see 5.0 - Specific

Seite 3 - TABLE OF CONTENTS

Installation73.4.1 Installing the Edge Guard1. Press edge guard to top cover cut outs by pressing along the edge of the cut out opening.2. Trim excess

Seite 4

Installation8Figure 6 19" EIA rail repositioningPosition 19" EIA Rails on 800mm Cabinets1. Determine the proper location of the 19" EIA

Seite 5 - 1.0 INTRODUCTION

Installation93.4.3 Door—Remove and ReverseDCF doors are removable for convenience when installing or maintaining equipment. The DCF front door is also

Seite 6 - 2.0 MAJOR COMPONENTS

Installation10Figure 9 Alternate door hinge position and grounding wire location3.4.4 Side PanelsThe DCF uses dual split side panels fashioned from sh

Seite 7 - 2.2.2 Side Panels

Installation113.5 Power Distribution Unit MountingPower distribution units may be mounted multiple ways in the DCF Optimized Rack System rack. They ma

Seite 8 - 2.2.3 Top Cover

Installation123.7 Baying ConfigurationTwo or more DCF cabinets of the same height can be bayed with the supplied baying brackets. The brackets have th

Seite 9 - 3.0 INSTALLATION

Periodic Maintenance134.0 PERIODIC MAINTENANCEYour DCF Optimized Rack System cabinet requires no special maintenance. It should be cleaned periodicall

Seite 10

Specifications145.0 SPECIFICATIONSFigure 13 DCF Optimized Rack System model numbersTable 5 DCF pre-configured optimized rack systemsPart # Description

Seite 12

IMPORTANT SAFETY GUIDELINESSAVE THESE INSTRUCTIONSThis manual contains important instructions that should be closely followed during install

Seite 13 - Reverse the Door

Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, a business of Emerson (NYSE:EMR),is the global leader i

Seite 14 - Replace a Side Panel

iTABLE OF CONTENTSIMPORTANT SAFETY GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21.0

Seite 15

iiFIGURESFigure 1 Caster plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Seite 16 - 3.7 Baying Configuration

Introduction11.0 INTRODUCTIONThe highly versatile DCF Optimized Rack System provides an organized, secure, controlled environment in a single system f

Seite 17 - 4.0 PERIODIC MAINTENANCE

Major Components22.0 MAJOR COMPONENTSDCF Optimized Rack System will have all of the components addressed in this section. All components are finished

Seite 18 - F26 11 2121

Major Components32.2.2 Side PanelsSide panels for the DCF Optimized Rack System are a split side panel design constructed of sheet metal. Each side pa

Seite 19

Major Components42.2.3 Top CoverAll DCF racks ship with top cover constructed of sheet metal. The top cover has cutouts for fan mounting, cabling, and

Seite 20 - SL-11391_REV0_05-12

Installation53.0 INSTALLATION3.1 InspectionUpon receiving a DCF Optimized Rack System, examine the packaging for any signs of mishandling or damage. I

Kommentare zu diesen Handbüchern

Keine Kommentare