TESTING & SERVICE
(continued)
2-- 2
TROUBLE-SHOOTING
Note any opt ional accessories that may be furnished on
the ADTB and review their operation. Refer to any
separate drawings and/or instructions that may be
packed with the ADTB.
Hazardous voltage capable of causing shock,
burns, or death is used in this switch.
Do not touch the power or load terminals
ofthebypassswitchortransferswitch!
Table 2-1. Trouble-Shooting Checks.
P
R
O
B
E
M
CHECK IN NUMERICAL SEQUENCE
P
R
O
B
E
M
1OPERATION 2 GEN-SET 3VOLTAGE
Engine–generator set does
not start when the Transfer
Control switch is turned and
held
in Transfer Test position
or when normal source fails.
Hold Transfer Test switch 15
seconds or the outage must
be long enough to allow for
Feature1Ctimedelayplus
engine cranking and star ting.
Starting control must be in the
automatic position. Batteries
must be charged and
connec ted. Check wiring to
engine starting contacts.
---
Transfer switch does not
transfer the load to the
emergency source after the
engine–generator set starts.
W ait for Feature 2B time delay
to time out.
Generator output circuit
breaker must be closed.
Generator frequency must be
at least 95% of nominal (57 Hz
for a 60 Hz system.) *
Voltmeter should read at least
90% of nominal phase to
phase voltage between
terminals EA and EC (or EL1
and EL2 for 2 pole switches)*
Transfer switch does not
transfer the load to normal
source when normal returns
or when the Transfer Control
switch is released.
W ait for Feature 3A time delay
to time out.
---
Voltmeter should read at least
90% of nominal phase to
phase voltage between
terminals NB and NC, NC and
NA , and NA and NB (or NL1
and NL2 for 2 pole switches).
Gen. does not stop after load
retransfer to normal source.
W ait for Feature 2E time delay
to time out.
Starting control must be in the
automatic position.
---
Load Disconnect Active light
comes on.
W ait for load disconnect time
delay to time out.
Explanation: Transfer switch in delayed transition transfer mode.
Load disconnect time delay is adjustable from 0 to 5 min. 59 sec.
Load Disconnect Active light
staysonlongerthan6min.
Check load disconnect time
delay setting. Call ASI.
Explanation: Transfer switch contacts are open longer than 5
min. 59 sec (maximum setting). Load remains disconnected.
* These are factory settings. Refer to Controller User’s Guide.
If the pr ob l em is isol ated to circu its on the con trol l er or the transfer switch , call your local AS CO Power Techn ol og ies
sales office or ASI at 1–800–800–2726. Furnish the Serial No. and Catalog No. from the transfer switch nameplate.
MANUAL LOAD TRANSFER
This procedure manually transfers load to other source if
the Transfer Switch or C ontrol Panel are out of service.
Close enclosure doors to prevent personal
injury in case of electrical system fault.
1. Be sure that the Bypass Handle is CLOSED on
eit her Emergency or Normal (see page 3–1).
2. Be sure that the Isolation Handle is in the TEST or
ISOLA TE position (see page 3–2).
3. TurntheBypassHandlecounterclockwiseto
OPEN the Bypass Switch. Then Bypass to the
other source (see page 3–1).
MAINTENANCE HANDLE
Bypass and isolate the Transfer Switch
before using the maintenance handle! See
pages 3–1 and 3–2. Remove the hub and
handle after using them and store on frame.
Turn counterclockwise
to OPEN contacts.
Turn clockwise to
CLOSE contacts.
insert
handle
into hole
Grasp
handle
firmly
slide hub
onto shaft
&insertpin
Pull out shaft to operate
Emergency contacts.
Push in
shaft to operate
Normal contacts.