Emerson ASCO 336 Series Paralleling System Wartungshandbuch

Stöbern Sie online oder laden Sie Wartungshandbuch nach Stromgeneratoren Emerson ASCO 336 Series Paralleling System herunter. Emerson ASCO 336 Series Paralleling System Technical Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 7
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO
www.EmersonNetworkPower.com/ASCO
8-2014 1 Publication 3279
SUGGESTED SPECIFICATION
for
Low Voltage (600V) Generator Paralleling Switchboard
PART 1 GENERAL
1.1 Scope
A. The intent of this specification is to provide power control for the parallel operation of __
generator units (up to 4) rated ___ KW at __ power factor, ___ volts, 3 phase, __ wire,
[50 | 60] Hertz. [If they are all different KW’s, list them separately.] All components and
testing specified or required for a complete operable system shall be included.
1.2 Application Codes and Standards
A. UL 891 – Switchboards
B. ISO 9001:2008 – Requirements of a Quality Management System
1.3 Manufacturer’s Qualifications
Automatic Transfer Switches, Bypass Switches, Paralleling Switchboards and Switchgear,
Monitoring and Control shall be supplied by ASCO. The equipment described, as a minimum,
shall meet all of the requirements specified in this section. The equipment shall be the product of
a manufacturer who has produced paralleling electrical equipment for a period of no less than 50
years. The manufacturer must provide integral electrical and mechanical design, fabrication and
construction services for all cubicle structures, formed and punched bus bar, and control panel
assemblies. Comprehensive documentation detailing electrical and mechanical designs shall be
available upon request. The manufacturer must be certified under ISO 9001.
1.4 Order Management
Management of orders shall be assigned to personnel employed and trained specifically and
exclusively for project management; the use of field service representatives, design engineers or
sales representatives for order management purposes shall not be acceptable. Each order shall be
managed by both a factory-based project manager and a factory-direct field-based project
manager.
1.5 Documentation
A. Submittals for approval shall include the following:
Seitenansicht 0
1 2 3 4 5 6 7

Inhaltsverzeichnis

Seite 1 - 1 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 1 Publication 3279 SUGGESTED SPE

Seite 2 - 2 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 2 Publication 3279 1. Elevation

Seite 3 - 3 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 3 Publication 3279 1. Structure

Seite 4 - 4 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 4 Publication 3279 All wiring to

Seite 5 - 5 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 5 Publication 3279 Each generato

Seite 6 - 6 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 6 Publication 3279 Generator Run

Seite 7 - 7 Publication 3279

ASCO Power Technologies, Florham Park, New Jersey 07932. 800-800-ASCO www.EmersonNetworkPower.com/ASCO 8-2014 7 Publication 3279 5.1 It shall

Kommentare zu diesen Handbüchern

Keine Kommentare