Quick Installation Guide00825-0100-4530, Rev ECMarch 2013Superior Performance Guided Wave Radar Level and Interface Transmitter
March 201310Quick Installation GuideStep 3 continued...HART communicationThe Rosemount 5300 Series transmitter operates with a power supply ranging fr
Quick Installation Guide11March 2013Step 3 continued...Type n approvals : non-sparking / energy limited power supplyTransient protection terminal bloc
March 201312Quick Installation GuideStep 3 continued...Load limitationsThe Field Communicator requires a minimum load resistance of 250 within the l
Quick Installation Guide13March 2013Step 3 continued...FOUNDATION fieldbusThe Rosemount 5300 Series transmitter, FOUNDATION fieldbus version, operates
March 201314Quick Installation GuideStep 3 continued...Type n approvals : non-sparking / energy limited power supplyRS-485 with Modbus communicationTh
Quick Installation Guide15March 2013Step 4: ConfigureNOTE:If the transmitter is pre-configured at the factory, it is only necessary to proceed with th
March 201316Quick Installation GuideConfiguration using the Rosemount Radar Master software1. Start Rosemount Radar Master (Programs > Rosemount &g
Quick Installation Guide17March 2013are normally configured at the factory, but can be changed if, for example, the probe is cut in the field, or if d
March 201318Quick Installation GuideClick Next and the following window appears (Tank Environment).8. In the Environment window, select Measurement Mo
Quick Installation Guide19March 2013the available pre-defined tank options, or if high volume accuracy is desired.Choose None if volume calculation is
March 20132Quick Installation GuideAbout this guide This installation guide provides basic guidelines for Rosemount 5300 Series transmitters. It does
March 201320Quick Installation Guide12. The Basic Configuration with the Radar Master Wizard is now finished. Proceed with the Device Specific Setup t
Quick Installation Guide21March 2013Safety Instrumented Systems (4-20 mA only)The following section is applicable to the Rosemount 5300 Prior-Use opti
March 201322Quick Installation GuideDampingUser adjusted damping affects the transmitter’s ability to respond to process changes. Therefore, the dampi
Quick Installation Guide23March 2013Site acceptanceAfter the installation and configuration, proper operation of the transmitter should be verified. A
March 201324Quick Installation Guide6. Enable write protection.7. Restore the loop to full operation.8. Remove the bypass from the safety logic solver
Quick Installation Guide25March 2013Product certificationsEU conformityThe EC declaration of conformity can be found on page 33. The most recent revis
March 201326Quick Installation GuideI5, IE1 Intrinsically safe and FISCO model:Intrinsically Safe for Class I, II, III, Div. 1, Groups A, B, C, D, E,
Quick Installation Guide27March 2013European certificationsATEX approvalsSpecial conditions for safe use (X)The intrinsically safe circuits do not wit
March 201328Quick Installation GuideBrazilian certificationsINMETRO approvalsSpecial conditions for safe use (X)Letter X in the number of the certific
Quick Installation Guide29March 2013I21 Intrinsically safe:4-20 mA/HART model:Ex ia IIC T4 GaEx ta IIIC T79 °C-50 °C < Ta < +70 °CUi: 30 V, Ii:
Quick Installation Guide3March 2013Any substitution of non-authorized parts or repair, other than exchanging the complete transmitter head or probe as
March 201330Quick Installation GuideIC1 FOUNDATION fieldbus FISCO model:Ex ia IIC T4 (-50 °C < Ta< +60 °C) DIP A20 TA69 °CUi = 17.5 V, Ii = 380
Quick Installation Guide31March 2013IECEx certificationsIECEx approvalsSpecial conditions for safe use (X)The intrinsically safe circuits do not withs
March 201332Quick Installation GuideOther certificationsOverfill protectionCert. no: Z-65.16-476U1 TÜV-tested and approved by DIBt for overfill protec
Quick Installation Guide33March 2013EC Declaration of ConformityFigure 1. EC Declaration of Conformity - page 1
March 201334Quick Installation GuideFigure 2. EC Declaration of Conformity - page 2
Quick Installation Guide35March 2013Figure 3. EC Declaration of Conformity - page 3
Emerson Process ManagementRosemount Measurement 8200 Market Boulevard Chanhassen, MN 55317 USA Tel (USA) 1 800 999 9307Tel (International) +1 952 906
March 20134Quick Installation GuideStep 1: Confirm system readinessConfirm HART revision capability If using HART-based control or asset management s
Quick Installation Guide5March 2013Step 2: Mount the transmitter head/probeTank connection with flange1. Place a gasket on top of the tank flange. 2
March 20136Quick Installation GuideStep 2 continued...Bracket mounting, on wall1. Mount the bracket directly to the wall with screws suitable for th
Quick Installation Guide7March 2013Step 2 continued...Remote housing1. Remove the transmitter head from the probe by unscrewing the M50 nut.For safe
March 20138Quick Installation GuideStep 3: Connect the wiringWiring and power supply requirements can be dependent upon the approval certification. As
Quick Installation Guide9March 2013To connect the transmitter1. Verify that the power supply is disconnected.2. Remove the terminal block cover (see p
Kommentare zu diesen Handbüchern